Mattapoisett River Valley Water Supply District Commission ( MRVWDC ) -2011
Contact TypeContact Information
Contact:
Superitendent, Water and Sewer Dept., Town of Mattapoisett
Address:
Mattapoisett River Valley Water District
PO Box 1055
Mattapoisett , MA 02739-0474
Phone:
508-758-4161
Fax:
508-758-4162
Hours:
Monday - Friday
8:00am - 12noon
12:30pm - 4:30pm
Photo
 
Link to PageLink to Page
Fairhaven District Members
Term Expires
Jeff Osuch
2013
Alfred Raphael
2012
Richard Brodeur
2012
Marion District Members
David Pierce
Don Torres
Rob Zora
Mattapoisett District Members
Barry Denham
Nick Nicholson
Paul Silva
Rochester District Members
Laurell J. Farinon
Jeffery Eldridge
3million.jpg
Summary and Background

The Mattapoisett River Valley Water District includes water supply sources operated by the Towns of Fairhaven, Marion and Mattapoisett, also serving the Town of Rochester.
       Each town experiences elevated concentrations of iron and manganese in their wells, requiring several wells to be placed offline. Rather than constructing several treatment facilities for the eight wells, the Towns teamed to construct a single advanced water treatment facility.
        This is the third ultrafilitration treatment facility in the state, and provides exceptional treatments, allowing the Towns to meet and exceed current and future treatment standards.
       The Towns have worked together for the last 20 years on water resources protection through the Mattapoisett River Valley Water Supply Protection Advisory Committee. ~The Committee assessed annual fees to the members based on the amount of water pumped and uses these fees for land purchase and other water resource protection measures. ~They meet regularly regarding watershed planning, resource management and to review pumping data from within the valley. ~This Committee formed the basis of the District.

Formation of the MRVD

      In 2002 the Towns began discussions regarding source water quality, future supply needs and water treatment alternatives for reactivation of sources that were off line due to poor water quality. ~All three towns have lost supply capacity due to high concentrations of iron and manganese in their wells. ~

     At their spring 2003 Annual Town meetings, the four Towns approved funding for a study committee to look at water supply needs of the four communities. ~The Committee consisted of three appointees from each town. ~The Committee’s scope included review of current and future water supply capacity and demands, water quality, and treatment alternatives, development of recommendations as to the advisability of establishing a regional water district, organization of the district; and resolution of operation and control issues, and estimated construction, operation and maintenance costs of district facilities.

       In response to the Committee’s recommendations, the four Towns put forth articles for approval of the Regional Water District at their Spring 2004 annual Town meetings. ~The District was approved overwhelmingly by all four towns based upon written ballots. ~

Special Legislation, Chapter 367 of the Acts of 2004 , passed in October of 2004, established the District.

Design and Construction

The District’s engineers, Tata & Howard, assisted the Towns in evaluating and formulating the Water District. The project poses unique challenges due to varying water chemistry from well to well and the need for several miles of raw and finished water transmission mains. The engineers conducted a water supply study, water treatment facility siting evaluation, and completed the design of the ultrafiltration treatment facility.

The District water treatment facility project  consists of one 3-million gallons per day water treatment plant constructed on Town of Mattapoisett property located off Tinkham Lane. ~The water treatment facility treats water from the following sources:


Fairhaven Tinkham Lane
1.70 mgd
Fairhaven Wolf Island (1,2,3)
1.01 mgd
Mattapoisett No. 3~~~~~~
0.75 mgd
Mattapoisett No. 4~~~~~~
0.72 mgd
Mattapoisett No. 5~~~~~~
1.00 mgd
Marion Wolf Island~~~~~~
0.80 mgd
~~~~~~~~5.98 mgd

District facilities include:

  • 6MGD ultrafiltration water treatment facility (WTF)
  • Raw water transmission mains between the wells and the WTF
  • Finished water transmission mains from the WTF to the existing Town transmission ~~~~mains
  • Finished water main to Marion
  • Control/metering station at Marion connection
          The existing pumping stations will be upgraded to pump water to the District WTF, but operation of the pumping stations will remain the responsibility of the individual Towns.

Current Status

        The plant  went online in the spring of 2008 at a construction cost of $15,500,000.00



 
Virtual Towns & Schools Website